Installation instructions & User guide
IMPORTANT: This booklet should be given to the customer after installation and demonstration.
WARNING: Under no circumstances should this unit be connected to the mains water supply.
520M/520TS
®
Przeglądanie stron 0
1 2 3 4 5 6 ... 11 12

Podsumowanie treści

Strona 1 - Power Shower Units

Manual and Thermostatic Power Shower Units Installation instructions & User guideIMPORTANT: This booklet should be given to the customer after ins

Strona 2 - POWER SHOWER

Gently prise away the limiter from the frontcover and rotate to new position. Rotateclockwise for a cooler stop position and anti-clockwise for a warm

Strona 3

ASSEMBLY OF RISER RAIL, HANDSETAND SOAP DISHRemovableinsert in soapdish for easeof cleaningLocatingKeyAdditionalknock outfixing slot ifrequiredDiagram

Strona 4 - WHAT TO DO IF THINGS GO

We, Applied Energy Products Ltd., guarantee that should this power shower proveto be defective by reason of faulty workmanship or material within 24 m

Strona 5 - INSTALLATION INSTRUCTIONS

Thank you for choosing a quality 'Redring'product manufactured in Peterborough, England.CONTENTS PageInformation for the userImportant Safet

Strona 6

a)b)c)Diagram 33The limiter is factory set but can be adjustedto suit on site conditions. If the position of thelimiter requires adjustment please ref

Strona 7

The spray head rotatesthrough approximately 140oIN ORDER TO MAINTAIN THEPERFORMANCE OF YOURSHOWER YOU MUST CLEANTHE SHOWERHEAD.NOTE: After use it is n

Strona 8

Check for faulty potentiometerswitch, (located under knob'A' inside front cover). Switchshould be open circuit whenturned fully anti-clockwi

Strona 9 - AND COMMISSIONING

unit ie. Mounted as shown in diagrams 5/6.Choose a flat piece of wall to avoid possibilityof distorting the backplate thus making thefront cover a poo

Strona 10 - FILTER REMOVAL AND REFITTING

1. Surrey Flange (Top entry cylinder flange)Fitting Instructions. The hot connection to theShower unit can be taken directly from thehot cylinder usin

Strona 11 - AND SOAP DISH

9. With an isolating valve connected, flush thepipework through to remove particles etc.before making the final connection to theshower. A blockage in

Strona 12 - Guarantee

C) Electrical1. The electrical installation must be inaccordance with current BS. 7671 (I.E.E. regulations).2. The unit should be connected into a sw